|
Manutec’s low voltage switchgear panels have been designed to control systems for heating, ventilation, max demand, energy monitoring, right through to critical systems for hospitals and factories.
From initial design, to the manufacturing and commissioning of the final turn key product, Manutec works with the customer, to ensure all client specifications are met.
Using AutoCAD Electrical 2007, all designs are quickly produced and standard delivery time is two weeks from approval. All Manutec low voltage distribution switchgear conforms to IEC439-1 and BS5486-1 regulations (Forms 1,2,3 or 4).
All panels are shipped with controllers pre-programmed and factory acceptance tested.
Examples of MCCs:
Form 4 MCC
 |
|
Form 2 Containment Booth / Panel

|
|
Form 2 / AHU Panel

|
|
Theatre Panel

|
|
HVAC Panel

|
|
Remote Control Panels
 |
Please contact us to discuss your MCC requirements.
|
|
FEATURED SOLUTIONS
|